Skip to main content

Category: Misc


Description:

Installation of a wind turbine blade in The Crystal, Royal Victoria Dock, London in October 2014.

The blade was delivered to our workshop where it was reduced in size. The shorter piece was cut vertically to show a cross section.

Both pieces were taken to The Crystal and installed side-by-side in the exhibition.


  • Installation of a wind turbine blade in The Crystal, Royal Victoria Dock, London in October 2014
  • Installation of a wind turbine blade in The Crystal, Royal Victoria Dock, London in October 2014
  • Installation of a wind turbine blade in The Crystal, Royal Victoria Dock, London in October 2014
  • Installation of a wind turbine blade in The Crystal, Royal Victoria Dock, London in October 2014
  • Installation of a wind turbine blade in The Crystal, Royal Victoria Dock, London in October 2014

Please enable Javascript in your web browser to view the image gallery.


For further information about this or our services, or to discuss your specific requirements, please contact us.